| 
        
          
            | The Construction Technology Research Team develops construction and maintenance
            technology, mainly for earth structures such as road embankments,retaining
            walls and softground, aiming for the reduction of their life cycle cost.
            We also conduct research on performance-based design method andquality
            control method for earth structures.
 
 |  
 
        
          
            |  |  
            |  17 Jan 2013:[Top], [Reseach Overview], [Staff], [Test Facilities] and [Research]
 have been updated.
 
 |  
            |  |  
 
        
          
            | All inquiries to: Construction Technology Team,
 Geology and Geotechnical Research Group
 The Public Works Research Institute
 1-6 Minamihara, Tsukuba City, Ibaraki Prefecture, 305-8516
 TEL 029-879-6759
 FAX 029-879-6799
 |  
        
          
            | Copyright © 
 Public Works Research Institute |  |